UK grid connections, on autopilot
Grid connections, automated.
Software submits your G98, G99 and EV/HP applications, chases the DNO to deadline, and gets your customers energised — while your team stays on the tools.
G98 · G99 fast-track · G99 full · EV/HP · Connect Direct
Why it wins
Software does the work. Humans handle the exceptions.
Grid connection is a process built from machine-checkable rules and a handful of genuinely hard cases. We automate the process and put people exactly where judgement is needed — nowhere else.
The incumbent way
- A different portal, form and login for every DNO area.
- Applications bounced for a wrong capacity field or a missing cut-out photo.
- Weeks of silence, then a further-information request you have to decode.
- An ops person, or a paid consultant, chasing each job by email and phone.
G99 FT With SimpliDNO
- One design in — the routing engine picks G98, G99 or EV/HP for you.
- Ten machine checks catch the rejection reasons before a DNO ever sees them.
- Filed through Connect Direct where it exists; most domestic jobs auto-approve.
- The platform chases to deadline and drafts the replies. Humans handle only the exceptions.
How it works
From finished design to energised, in four steps
- 01
Send the design
Push a finished design from your CRM, or drop an SLD with the MPAN. We read the devices, capacity and phase.
- 02
Route & pre-flight validate
The routing engine picks G98, G99 fast-track or EV/HP, then runs the ten checks a DNO would reject you for — in under a second.
- 03
Submit via Connect Direct, portal or human
We file through the ENA Connect Direct API where it exists, a portal bot where it doesn't, and a real person for the rest.
- 04
Auto-approved, chased, closed
Most domestic jobs auto-approve. The others we chase to deadline, draft the further-information replies, and close out.
Try it free
Check any install in seconds — no account needed
Enter a system and we'll tell you the connection route, the amps per phase, and whether it connects-and-notifies or needs an application. The same routing engine that powers the platform.
This design is G99 fast-track — ~15 working days.
National Grid Electricity Distribution (from postcode) · 5.00 kW aggregate
- Auto-fixMPAN is missing.Resolve automatically via the MPAN waterfall (ECOES / NGED lookup / bill photo).
- Auto-fixNo single-line diagram supplied.The Document Factory will generate one from the equipment list.
- CheckNo cut-out photo on file (required for Connect Direct).Send a magic-link photo request to the installer on site.
- Auto-fixNo customer consent recorded.Trigger the e-sign flow to capture consent.
DNO league table
Which network gets your customers connected fastest?
Preview data — populated from our own submissions once live.
Pricing
Free to run your pipeline. You pay when we submit.
Track and route every connection at no cost. When you want the platform to file and chase on your behalf, pricing is transparent and usage-based — you only pay for work done.
Free — CRM & tracking
Always free
- Track every connection across all your DNO areas
- Automatic route classification and pre-flight validation
- The route checker, MPAN tools and DNO league table
- Unlimited users — invite the whole install team
We submit Pay as we submit
Usage-based
- A per-notification charge for G98 connect-and-notify
- A flat fee per G99 fast-track submission we file and chase
- Volume tiers that step down as you scale
- Revenue share for platform partners embedding SimpliDNO
Indicative model — final rates published at launch.
Ready to stop chasing the DNO?
Book a 20-minute demo and we'll route one of your live jobs on the call — or try the route checker first, no account needed.